为所有供应商提供的信息
在该区域中,我们将向您介绍所有对供应商
极为重要的准则、表格和文件。
PPAP – Production Part approval process – requirements (PDF, English)
PPAP | PDF Requirements 101 Forged Parts and casted parts
PPAP | PDF Requirements 102 Die casted parts
PPAP | PDF Requirements 103 Sintered parts
PPAP | PDFRequirements 105 Turned milled machined
PPAP | PDF Requirements 106 Welded components
PPAP | PDF Requirements 107 Pressed and bend steel parts
PPAP | PDF Requirements 108 Lasered parts
PPAP | PDF Requirements 110 Tubes
PPAP | PDF Requirements 111 Alu profile bent alu
PPAP | PDF Requirements 201.1 Bolt, nuts, norm parts (C-parts defined by norm, or ACPS drawing and used in the load path)
PPAP | PDF Requirements 201.2 Bolt, nuts, norm parts (C-Parts defined by norm and not used in the load path)
PPAP | PDF Requirements 201 C parts according ACPS drawing
PPAP | PDF Requirements 202.1 Labels
PPAP | PDF Requirements 202 Packing and printed material
PPAP | PDF Requirements 203 Wires and cable pulls
PPAP | PDF Requirements 204 Technical springs
PPAP | PDF Requirements 206 Locks
PPAP | PDF Requirements 301 Surface treatment
PPAP | PDF Requirements 302 Electro plating galvanize
PPAP | PDF Requirements 303 Coating KTL powder
PPAP | PDF Requirements 304 Painting
PPAP | PDF Requirements 305 Heat treatment
PPAP | PDF Requirements 401 Plastic parts
PPAP | PDF Requirements 402 Rubber parts
PPAP | PDF Requirements 403 Foam parts
PPAP | PDF Requirements 404 Textiles and nets
PPAP | PDF Requirements 501 Electronics and cable sets
PPAP | PDF Requirements 502 Wiring harness
PPAP | PDF Requirements 503 Control unit
PPAP | PDF Requirements Directed buy parts